We are eco-friendly and stylish

Installation and connection works have now been completed. Nearly 120 kW of solar panels have been installed on the roof of our factory, with partial funding provided by EU structural funds.

We selected the highest-quality equipment to meet our future needs. This is a long-term project intended to maximise electricity production and help reduce environmental pollution.

Before making the final decision, we carefully considered:

    • The solar panels’ capacity to generate maximum energy
    • The longevity of the equipment
    • Guarantees regarding power loss
    • Protection against fire and other hazards
    • The ability to monitor the panels’ performance in detail
    • Fault detection capabilities

       

  • Dalytis: